Water and Wastewater

Brightwater Aeration Basin Optimization Classifying Selector

Brightwater Aeration Basin Optimization Classifying Selector

Franklin Pacific constructed a cast in place concrete classifying selector as part of an optimization project at the Brightwater Water Treatment Plant. The 300 cubic yard project included a serpentine classifying selector tank built with 17 foot tall walls to control the water flow.  The structural concrete work was completed in 6 weeks.

Client reference

GC: JW Fowler Co.

Owner: King County, WA

Location: Woodinville, WA

Contract Amount: $555,971.33