Water and Wastewater

China Creek Restoration Project Phase 2

China Creek Restoration Project Phase 2

Construction of a new concrete and steel framed flood control weir as part of the channel restoration project for China Creek.  The concrete weir foundation is a 22 foot x 58 foot mat foundation with 17 foot tall wing walls.  A 16 foot tall steel framed structure built between the wing walls supports adjustable stop logs for control of the creek flow.

Client reference

GC: Glacier Environmental Servies, Inc.

Owner: City of Centralia

Location: Centralia, WA

Contracted Amount: $336,222.49