Franklin Pacific was the structures subcontractor to Road Construction Northwest for the Lake to Sound Trail Segment B project. We constructed a 400 foot long by 12 foot wide elevated structure over a wetland area as part of the Lake to Sound Trail.  42 – 10 inch pipe pile were installed to support elevated cast in place pile cap. 4400 square feet of hollow core plank are supported by the pile cap and a 3” concrete topping slab was placed. Steel pipe guard railing was installed along each side of the walkway.

Client reference

GC: Road Construction Northwest, Inc.

Owner: King County, WA

Location: Burien, WA