Upper Buckley Water Quality Project

Upper Buckley Water Quality Project

We constructed a 87,000 gallon subterranean storm water facility as a subcontractor to Northwest Cascade in 2022. The concrete vault is 90 feet long by 25 feet wide with 8 foot tall walls.  A 24” thick cast in place lid was constructed to support multiple precast concrete man hole risers.  The structure was built within a speed rail shoring system that was approximately 27 feet deep.

Client reference

GC: Northwest Cascade, Inc.

Owner: City of Tacoma

Location: Tacoma, WA

Contracted Amount: $713,046.94