Franklin Pacific was a subcontractor to Landis and Landis Construction in summer and fall of 2009 for the construction of a new three span 180 foot precast slab span bridge over Euchre Creek in Gold Beach, Oregon for Oregon DOT. The bridge work includes 24” diameter and HP12x53 pile foundations, cast in place concrete pile caps, and 33 precast concrete girders, a 5” concrete deck and 13” end panels, and cast in place bridge rails. The project also included the design and construction of a 90 foot detour bridge. The value of the bridge work is approximately $1.3 million.

Client reference

GC: Landis and Landis Construction

Owner: Oregon DOT

Location: Gold Beach, OR